Cases

A selection of cases is included in this section. Each case has (partially) integrated circular construction methods. The selection of the cases is based on several criteria: consideration has been given to future changes to the façade, to the need for adaptability of the façade and to the general impact on the environment. These criteria may or may not have been implemented at the end in the building or façade.

Circular Retrofit Lab

VUB Architectural Engineering

La maison du project La Lanière

SEM Ville Renouvelée

B.R.I.C.

Brussels Training Centre, EFP

Aeropolis II

architectesassoc+

Bouwdeel d(emontabel)

Cepezed

Galileo Reference Center

de Architekten Cie.

© 2020 Charlotte Cambier. Created within the framework of a PhD research, funded by FWO Research Foundation Flanders.